Drop Bury Jobs: One List, From Marked Map to Invoice

Drop work is volume. Dozens of small jobs a week, arriving from more than one source, each one driven to, closed out, and billed. The mechanism keeps that list in one place, has the crew mark the map and submit from the site, and lets the submitted map show the job is done instead of a phone call.

Book a Fit Call
From a paper map in the truck to the job list on a phone. The crew marks the map and submits from the site.

Where the Time Goes on Drop Work

Jobs come in through two paths in two formats. Tickets and work orders come out of the customer's portal export. The calendar gets scanned by hand every day to catch the ones added later. That second pass exists because the first source cannot be trusted on its own, and somebody has to reconcile the two so nothing is duplicated and nothing is missed.

Then every completed job gets updated twice: once in the portal and once on the tracking sheet. Open tickets are chased by calling subs. There is no status feed, so knowing where a job stands means calling the crew or reading line by line through what the subs turned in that week.

The part that carries the most risk is not the time. It is the job that was added to the calendar, missed, and is sitting past due before anyone knows it exists.

Four Steps, One List

The mechanism is the same in every market. A job lands on one list once, and everything downstream, the marked map and the tally, lands on that record.

One List

Each job goes on one list, with the job number, the PO, and the address entered once.

Set Up the Map

The office sets up each job once, with the map the crew will mark.

Mark and Submit

The crew opens the job's map, marks it on site, and submits once. The tally comes from the marks.

Ready for the Invoice

Billing codes and quantities come off the marks the crew submitted, so the tally is ready for the invoice without a second round of data entry. Each line is priced from your price book. The Drop Production package is on the pricing page.

The test: pick one job that closed last week and ask three questions. When did it come in, and when did the crew submit it? How far did the crew drive from the job before it? Where are the photos? If any answer is "let me check with the crew," that is where the day goes.

One Drop Bury, Map to Invoice

One day, one address, one bury. The tally is ready for the invoice.

Book a Fit CallHow map to invoice works

Drive Time Never Reaches an Invoice

Working drops in the order they came in can send crews back and forth across the same territory. In rural markets the drive between jobs can be long. Drive time is paid time that never reaches an invoice.

The order the crew works the list is still the dispatcher's call. What one list changes is everything after the drive: the crew marks the map and submits from the site, the tally comes from the marks, and the office sees the priced tally instead of rebuilding the job a week later.

What Has to Be True for It to Work

None of this is a product feature. It is six conditions on how the job list is kept. You may already meet one or two of them.

Both Sources Land on One List

The office adds each job to one list, whichever place it came from, so there are not two lists to match each day.

Check for Repeats Too

Check each new export against last month's finished jobs, so nobody works a repeat twice.

What Was Placed and When Is on the Record

The record shows what was placed and when it was submitted, so nobody types it in later.

Crews Work From the List

On a phone, where they open the job's map, mark it, and submit from the site. Not from a chat thread.

The Submitted Map Says It Is Done

A job is done when the crew marks the map and submits it.

The Working List Stays Short

Keep finished jobs off the working list, and keep past-due jobs where you can see them.

What This Means for the Ramp Up

If the plan is to take on more work, the tracking method that is straining today is the constraint. More volume through a manual process means more missed jobs, not more revenue.

The cleaner path is to make the existing crews more productive first. That also makes the added volume absorbable without adding admin on the office side.

How We Build It With You

There is no drop bury package to buy here. The customer's export formats, the sub arrangements, and the crew habits are yours, and the build has to fit them or the crews route around it.

The Operations Audit traces one week of drop work from the export to the invoice and shows where the list is being rebuilt by hand, where the duplicates come from, and what would have to change for the submitted map to show a job is done. The usual first step after that is a single market as a pilot, one account only. Prove it there, then duplicate the setup market by market, adjusted for what each one needs to see. That keeps the initial commitment small and gives you something real to point at before anyone commits further.

Questions Contractors Ask

What is a drop bury?

The last piece of a fiber build: the buried drop from the pedestal or hand hole to the customer's home or business. One address, usually one day, and a high volume of them across a market. The work is small. The list is what gets out of hand.

Where do the jobs come from?

Usually a ticket or work order export from the customer's portal, plus jobs added to a shared calendar after the export ran. The office sets up each job on one list, with its job number, PO, address, and the map the crew will mark, so the crew works from that list instead of the calendar.

What happens when a customer disputes an install later?

The marked-up map the crew submitted is on the job record, not in a folder on somebody's phone. The record shows what was placed and when it was submitted. That is the answer to the dispute.

What does a drop bury crew do?

A drop bury crew buries the fiber line that runs from the pedestal or hand hole to one home or shop. Some ISPs run a temporary line first. The crew buries it later. Before anyone digs, the crew needs an 811 locate ticket. Each job is usually one address and one day.

How is drop bury work billed?

By the codes in your contract. A drop is often billed as one unit. A long run, a bore or a road crossing can carry its own code. Your price book has the code and the rate for each one. Each invoice line is the code, times the quantity, at that rate. Check your contract for the details.

Why do drop bury jobs get missed or done twice?

Jobs come in from two places: the customer's portal export and jobs added to the calendar later. Someone often has to match the two by hand each day. Miss one, and a job sits past due. Count one twice, and a crew drives to a job that is done. Keep both on one list and check it each day.

What should the crew turn in when a drop bury is done?

Whatever your ISP's contract asks for. That often means the work order number, the marked map with codes and quantities, the 811 ticket, and photos of the bury and the cleanup. Get the list before the first job. When the crew turns it in on the day, the office can bill without a phone call.

How does TCS help with drop bury work?

The office sets up each job once, with its project number, PO, address and map. The crew marks the map on a phone at the site and submits it. The tally comes from the marks. It is priced from your price book, ready for the invoice. To see how it works on drop jobs, Book a Fit Call.

About the author

Gil Ramirez founded Telecom Contractor Solutions in Houston. He works inside the back office of fiber and telecom contractors running 10 to 100 field techs, on the gap between the field and the invoice.

Would it be a bad idea to trace one week of your drop work from the export to the invoice? Book a Fit Call. Background is on the about page.

How many drop jobs are sitting on your calendar right now?

Would it be a bad idea to spend 30 minutes tracing one week of drop work from the export to the invoice? Free 30-minute Fit Call. We will tell you whether an Operations Audit is a fit.

Book a Fit Call

Get this coverage first in Google